Subfloor Plumbing     This was not complex but had to be done twice from scratch. Plumber Bruce.
Subfloor plumbing    
On second inspection the joists passed. Next inspection: subfloor plumbing. I had not allowed time for this. It consumed weeks.


1. Subfloor plumbing
The sub-floor plumbing I had to do twice. The first time I used PVC. The inspector failed that. In some recent year PVC because forbidden for plumbing.
_24may05-mcb_1807.jpg
_24jun02-mc_1637.jpg
_24jun21-mc_1716.jpg
The plumbing inspection requires the drain system to be presurized by 10' of water. Hence this 10' vertical pipe.
_24jun21-mc_1844.jpg
_24jun21-mc_1845.jpg
While awaiting inspection I begin to place the plywood where there are no pipes to inspect.
_24jun21-mcn_1846.jpg
_24jun21-mc_1846a.jpg
_24jun21-mc_1846.jpg
After the first failed inspection I had to completely re-do this as well. I had used a Y-fitting in a forbidden orientation.
_24jul07-mcb_1356.jpg
_24jul07-mcb_1357.jpg
_24jul07-mcb_1357a.jpg
The second interation - all PEX.
_24aug03-mcn_1038.jpg
_24aug03-mc_1038.jpg
_24aug10-mcb_1209.jpg
_24aug10-mcb_1209a.jpg