Prev: Subfloor Plumbing   (12 total pages) Click on any for a larger view   Next: L1 Framing
Pages
Level 1 floor plywood     Weird perimeter; many holes.
Floor plywood    
June 30. This begins the great sprint. How much framing do I dare before the next rainy season? Whatever is finished by winter must be covered. Rains can commence in late October.


1. Floor plywood
The subfloor plumbing passed. Now I proceed at my best speed with T&G floor plywood; The perimeter has no right angles. The bolts, pipes and conduits require hundreds of holes around the perimeter.Occasionally a framing contractor stops by to laugh at this one-man show.
_24jun30-mc_1112.jpg
June 30
_24jul04-mcb_1956.jpg
July 4
_24jul04-mcb_1957.jpg
_24jul13-mcn_1253.jpg
_24jul13-mc_1413.jpg
July 13
_24jul13-mc_1414.jpg
July 13 - hurrying to get this in place so wall framing may begin.
Prev: Subfloor Plumbing   (12 total pages) Click on any for a larger view   Next: L1 Framing

Automatically generated by "UrAlbum" script-driven software by Bruce Wicinas © 2005-2025. Not phone-friendly (use a real screen.) 250318