Prev: Subfloor Plumbing
(12 total pages) Click on any for a larger view Next: L1 Framing
| ||||
| ||||
Level 1 floor plywood Weird perimeter; many holes.
| ||||
Floor plywood | ||||
June 30. This begins the great sprint. How much framing do I dare before the next rainy season? Whatever is finished by winter must be covered. Rains can commence in late October. |
The subfloor plumbing passed. Now I proceed at my best speed with T&G floor plywood; The perimeter has no right angles. The bolts, pipes and conduits require hundreds of holes around the perimeter.Occasionally a framing contractor stops by to laugh at this one-man show.
| ||