Concrete forms     The forms appear. This building is happening.
Forms appear First pour The air layer between slabs
Second pour The concrete is done; the check is writt  
Concrete forms


1. Forms appear
_10may15-nm_1200.jpg
At this point the neighbors noticed construction was underway.
_10may15-nm_1744.jpg

_10may15-nm_1744a.jpg

_10may15-nm_1745d.jpg

_10may15-nm_1745e.jpg

_10may15-nm_1745.jpg

_10may15-nm_1745a.jpg

_10may15-nm_1745b.jpg

_10may15-nm_1745c.jpg

_10may15-nm_1746.jpg

_10may15-nm_1909.jpg
More pipes.
_10may15-nm_1910.jpg

_10may15-nm_1912.jpg

_10may30-nm_1451.jpg

_10may30-nm_2040.jpg

_10jun02-nm_1425.jpg

_10jun02-nm_1426.jpg

_10jun02-nm_1426c.jpg

_10jun06--towrb_2058.jpg

_10jun06--towrb_2059.jpg

_10jun06--towrb_2059a.jpg

_10jun06--towrb_2100.jpg

_10jun08-nm_0845b.jpg

_10jun08-nm_0846a.jpg

_10jun08-nm_0846.jpg

_10jun08-nm_0846b.jpg

_10jun08-nm_0846c.jpg

_10jun08-nm_0847c.jpg

_10jun08-nm_0847b.jpg

_10jun08-nm_0847a.jpg

_10jun08-nm_0847.jpg

_10jun02-nm_1426a.jpg

_10jun02-nm_1426b.jpg



2. First pour
_10jun08-nm_0846d.jpg

_10jun08-nm_0848.jpg
Alvin's crew - Brandon and ?; the concrete pump contractor on the left. Awaiting the cement truck.
_10jun08-nm_0908.jpg

_10jun08-nm_1013.jpg

_10jun08-nm_1013a.jpg

_10jun08-nm_1021.jpg

_10jun08-nm_1021a.jpg

_10jun08-nm_0845a.jpg

_10jun08-nm_0845.jpg

_10jun08-nm_0846e.jpg



3. The air layer between slabs
_10jun19-nm_1813b.jpg

_10jun19-nm_1813a.jpg
First slab is poured; concrete blocks placed on it.
_10jun19-nm_1813.jpg

_10jun19-nm_1813d.jpg

_10jun19-nm_1813c.jpg

_10jun19-nm_1814a.jpg

_10jun19-nm_1814.jpg

_10jun19-nm_2028f.jpg

_10jun19-nm_2028e.jpg

_10jun19-nm_2028d.jpg

_10jun19-nm_2028c.jpg

_10jun19-nm_2028b.jpg

_10jun19-nm_2028.jpg

_10jun19-nm_2028a.jpg



4. Second pour
The second slab will be poured on top of the intervening air gap.
_10jun15-nm_1840a.jpg

_10jun15-nm_1841a.jpg

_10jun15-nm_1841b.jpg

_10jun15-nm_1922.jpg

_10jun15-nm_1922a.jpg

_10jun15-nm_1923.jpg

_10jun15-nm_1947.jpg
We're not perfectly square here.
_10jun15-nm_2030.jpg
The air connection between the two building's air chambers.
_10jun19-nm_1812.jpg



5. The concrete is done; the check is written. Now it's Bruce's turn.
_10jul03-nm_1207.jpg

_10jul03-nm_1902.jpg

_10jul03-nm_1903.jpg

_10jul03-nm_1903a.jpg

Prev: Concrete   (6 total pages) Click on any for a larger view   Next: Summer 2010

Automatically generated bya "UrAlbum" software by Bruce Wicinas © 2005-2023. Viewing on phone NOT RECOMMENDED. 240327