2. Replace an undersized beam
|
_13aug15-nm_1626.jpg The engineer had specified 4x6 for this member. Supporting a lot of structure, I worried it was undersize. The particular 4x6 in place was sub-grade, twisting under its load. Replacing it with a 4x8 was complicated and time-consuming.
|
_13aug15-nm_1832.jpg
|
|
|
3. Adding an exterior decoration
|
_15sep07-nm_1733.jpg
|
_15oct18-nm_1637.jpg
|
_15oct18-nm_1638.jpg
|
_15oct18-nm_1643.jpg I wrapped the structure in cable as a "decoration" and hand-rail for safer maintenance access. As a decoration it fails; everyone asks "what's that?"
|
_15oct18-nm_1647.jpg For the roof of the second floor landing I had never devised a satisfactory solution.
|